Skip to main content

Rejected TakeOff

Flight Phase Inhibitions​

Flight Phases

Depending on the flight phase, certain ECAM warnings/cautions are inhibited. There is a T/O Inhibit - LDG Inhibit and a Landing Inhibit phase.

The Takeoff Inhibit phase starts actually when the first engine reaches takeoff power until the aircraft reaches 1500 ft AGL (or 2 minutes after takeoff). The Memo Message T.O. Inhibit is displayed on the E/WD.

The Landing Inhibit phase starts at 800 ft AGL and stays active until the aircraft reaches 80 kts after landing. The message LDG Inhibit is displayed on the E/WD.

Takeoff-Inhibit Phase 4​

In the Takeoff-Inhibit Phase 4 only the follwing Malfunctions are not inhibited:

Red Warnings​

  • ENG 1 (2) Fire
  • ENG 1 (2) OIL LO PR
  • ENG DUAL FAILURE
  • APU FIRE
  • F/CTL L+R ELEV FAULT
  • CONFIG WARNING

Amber Cautions​

  • ENG 1 (2) FAIL
  • ENG 1 (2) SHUTDOWN
  • ENG 1 (2) REV UNLOCKED
  • ENG 1 (2) THR LEVER FAULT
  • F/CTL L (R) SIDESTICK FAULT
  • FWS FWC 1 + 2 FAULT

Reasons for Rejected TakeOff​

The following reasons could make a rejected takeOff needed.

RTO at Groundspeeds below 72 Knots​

  • The Autobrake becomes active above 72 Knots
  • Be aware that in case of a RTO below 72 Knots the blue „ON“ light in the AUTO BRK MAX Pushbutton remains on, but the Autobrake is not braking! So use manual brakes!

RTO near V1​

  • from the Malfunction occuring to the point where brakes and spoilers are working fully, about 5 seconds will pass.
  • If you reject a takeoff 4 knots after V1 where no stop margin is available, you will get a runway overrun with up to 70 knots Groundspeed!
  • Statistically about 50% of all unsuccessfull Rejected Takeoffs could have been avoided with a „Continue“ decision. Almost 25% of those occured because of a tire failure.

Other reasons to reject a takeoff​

  • ATC call „XXX, stop immeadiately, XXX, stop immeadiately“.
  • Flock of big birds
  • Runway incursion
  • Aircraft not controllable or flyable
  • Windshear warning

Procedure for rejected takeOff​

Correct flow of the decision making process.


Once that is done, stopt the ECAM or QRH Procedure and consider going into the Ground Emergency EMER Evacuation checklist. This is done whenever the situation is life threatening for Passengers and Crew.